{"id":100562,"date":"2024-11-13T23:16:58","date_gmt":"2024-11-13T21:16:58","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding"},"modified":"2024-11-14T01:27:23","modified_gmt":"2024-11-13T23:27:23","slug":"zesa-blames-fault-at-hwange-for-increased-load-shedding","status":"publish","type":"post","link":"https:\/\/www.africa-press.cc\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding","title":{"rendered":"ZESA Blames Fault At Hwange For Increased Load Shedding"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electricity generation capacity due to a technical fault at Hwange Power Station.<\/p>\n<p>This issue has contributed to widespread power outages, with several areas across the country experiencing more than 24 hours without electricity.<\/p>\n<p>In a statement released on Wednesday morning, ZESA said the situation has been further worsened by low water levels at Kariba Power Station, which have significantly reduced its generation capacity. It said:<\/p>\n<p>ZESA Holdings would like to advise its valued stakeholders that the national power grid is currently experiencing reduced electricity generation capacity due to a technical fault at Hwange Power Station.<\/p>\n<p>This has been further compounded by low generation capacity at Kariba Power Station, resulting from low water levels.<\/p>\n<p>Our technical teams are actively working to resolve the fault at Hwange to minimize the impact on our customers.<\/p>\n<p>We sincerely apologize for the inconvenience caused.<\/p>\n<p>While ZESA Holdings announced on Wednesday that the national power grid was facing reduced electricity generation capacity due to a technical fault at Hwange Power Station, just an hour earlier, the Zimbabwe Power Company (ZPC), ZESA\u2019s power generating unit, had released power generation statistics indicating that Hwange had been consistently generating 874 MW since Monday.<\/p>\n<p>This apparent contradiction\u2014ZESA reporting a technical fault at Hwange, while ZPC maintains that the power station has been operating as usual\u2014has raised concerns about the accuracy and transparency of the power utility\u2019s reports.<\/p>\n<p>Critics suggest that the discrepancy between the two statements could lend credence to claims that ZESA\u2019s power generation statistics may not reflect the true situation on the ground and could be unreliable.<\/p>\n<p><strong>For More News And Analysis About Zimbabwe Follow Africa-Press<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electricity generation capacity due to a technical fault at Hwange Power Station. This issue has contributed to widespread power outages, with several areas across the country experiencing more than 24 hours without electricity. In a statement [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":100560,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,6,8],"tags":[5208,19],"class_list":{"0":"post-100562","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-all-news","8":"category-economy","9":"category-head-lines","10":"tag-hwange-power-station","11":"tag-zimbabwe"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v24.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>ZESA Blames Fault At Hwange For Increased Load Shedding - zimbabwe<\/title>\n<meta name=\"description\" content=\"Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electric ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ZESA Blames Fault At Hwange For Increased Load Shedding\" \/>\n<meta property=\"og:description\" content=\"Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electric ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-13T21:16:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-13T23:27:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"402\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding\",\"name\":\"ZESA Blames Fault At Hwange For Increased Load Shedding - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg\",\"datePublished\":\"2024-11-13T21:16:58+00:00\",\"dateModified\":\"2024-11-13T23:27:23+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\"},\"description\":\"Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electric ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg\",\"width\":720,\"height\":402,\"caption\":\"ZESA Blames Fault At Hwange For Increased Load Shedding\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.cc\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ZESA Blames Fault At Hwange For Increased Load Shedding\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ZESA Blames Fault At Hwange For Increased Load Shedding - zimbabwe","description":"Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electric ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding","og_locale":"en_US","og_type":"article","og_title":"ZESA Blames Fault At Hwange For Increased Load Shedding","og_description":"Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electric ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding","og_site_name":"zimbabwe","article_published_time":"2024-11-13T21:16:58+00:00","article_modified_time":"2024-11-13T23:27:23+00:00","og_image":[{"width":720,"height":402,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding","name":"ZESA Blames Fault At Hwange For Increased Load Shedding - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg","datePublished":"2024-11-13T21:16:58+00:00","dateModified":"2024-11-13T23:27:23+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4"},"description":"Zimbabwe\u2019s power utility, ZESA Holdings, has announced that the national power grid is currently facing reduced electric ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/11\/sm_1731527826.077958.jpg","width":720,"height":402,"caption":"ZESA Blames Fault At Hwange For Increased Load Shedding"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zesa-blames-fault-at-hwange-for-increased-load-shedding#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.cc\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"ZESA Blames Fault At Hwange For Increased Load Shedding"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/100562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/comments?post=100562"}],"version-history":[{"count":1,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/100562\/revisions"}],"predecessor-version":[{"id":100565,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/100562\/revisions\/100565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media\/100560"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media?parent=100562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/categories?post=100562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/tags?post=100562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}