{"id":46348,"date":"2021-09-08T16:53:51","date_gmt":"2021-09-08T14:53:51","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/?p=46348"},"modified":"2021-09-08T15:50:02","modified_gmt":"2021-09-08T13:50:02","slug":"zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation","status":"publish","type":"post","link":"https:\/\/www.africa-press.cc\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation","title":{"rendered":"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/zimbabwe\">Zimbabwe<\/a>. <\/strong><\/span>Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in August, the Zambezi River Authority (ZRA) has been revealed.<\/p>\n<p>ZRA said the Zimbabwe Power Company (ZPC), ZESA Holdings\u2019 electricity generation arm, had a balance of 5.28 billion cubic meters (BCM) of water while the Zesco Limited of Zambia had a balance of 3.65 BCM.<\/p>\n<p>In the past month, Zimbabwe has endured power debilitating power cuts due to depressed electricity generation, especially at the Hwange thermal power station.<\/p>\n<p>It was not immediately clear why ZPC was not fully utilising its water allocation at the Kariba Dam to maximise electricity generation. ZRA chief executive officer Munyaradzi Munodawafa said in the latest update:<\/p>\n<p>As of 31st August 2021, ZESCO Limited had utilised 17.35 BCM of its 21 BCM water allocation (83% utilisation), while the Zimbabwe Power Company had utilised 15.72 BCM of its 21 BCM water allocation (75% utilisation).<\/p>\n<p>This leaves a balance of 3.65 BCM and 5.28 BCM for ZESCO and ZPC, respectively, for utilisation during the remaining period of the year 2021.<\/p>\n<p>According to ZPC, on Monday the Kariba hydropower station was generating 680 megawatts (MW) of electricity of 1 626 MW.<\/p>\n<p>The combined output from Kariba and the country\u2019s thermal power stations was 1 174 MW against a peak demand of 1 700 MW.<\/p>\n<p>The ZRA said it will maintain the monthly water allocation for Zimbabwe and Zambia at 42 BCM despite indications that water levels were receding.<\/p>\n<p>It said lake levels at Kariba on September 1 stood at 481.55m compared to the last update made on August 4, which was at 482.16m.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in August, the Zambezi River Authority (ZRA) has been revealed. ZRA said the Zimbabwe Power Company (ZPC), ZESA Holdings\u2019 electricity generation arm, had a balance of 5.28 billion cubic meters (BCM) of water while the Zesco [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":46347,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,35,12,15],"tags":[1493,2189,670,2935,3425,675,1908,1153,19,914,519,1233],"class_list":{"0":"post-46348","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-all-news","8":"category-homepage-english","9":"category-policy","10":"category-twitter","11":"tag-africa-press","12":"tag-africa-press-zimbabwe-2","13":"tag-kariba","14":"tag-kariba-dam","15":"tag-zambezi-river-authority","16":"tag-zesa","17":"tag-zesa-holdings","18":"tag-zesco","19":"tag-zimbabwe","20":"tag-zimbabwe-power-company","21":"tag-zpc","22":"tag-zra"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v24.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation - zimbabwe<\/title>\n<meta name=\"description\" content=\"Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in Augus ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation\" \/>\n<meta property=\"og:description\" content=\"Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in Augus ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-08T14:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-08T13:50:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"402\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation\",\"name\":\"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg\",\"datePublished\":\"2021-09-08T14:53:51+00:00\",\"dateModified\":\"2021-09-08T13:50:02+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\"},\"description\":\"Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in Augus ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg\",\"width\":720,\"height\":402,\"caption\":\"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.cc\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation - zimbabwe","description":"Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in Augus ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation","og_locale":"en_US","og_type":"article","og_title":"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation","og_description":"Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in Augus ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation","og_site_name":"zimbabwe","article_published_time":"2021-09-08T14:53:51+00:00","article_modified_time":"2021-09-08T13:50:02+00:00","og_image":[{"width":720,"height":402,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation","name":"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg","datePublished":"2021-09-08T14:53:51+00:00","dateModified":"2021-09-08T13:50:02+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4"},"description":"Zimbabwe and Zambia failed to utilise their maximum water allocation for electricity generation from Kariba Dam in Augus ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/09\/img-6138bf6c1d24f.jpg","width":720,"height":402,"caption":"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zimbabwe-zambia-fail-to-finish-kariba-water-allocation-for-electricity-generation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.cc\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"Zimbabwe, Zambia Fail to Finish Kariba Water Allocation For Electricity Generation"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/46348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/comments?post=46348"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/46348\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media\/46347"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media?parent=46348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/categories?post=46348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/tags?post=46348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}