{"id":66089,"date":"2022-09-13T17:40:49","date_gmt":"2022-09-13T15:40:49","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years"},"modified":"2022-09-13T20:28:44","modified_gmt":"2022-09-13T18:28:44","slug":"portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years","status":"publish","type":"post","link":"https:\/\/www.africa-press.cc\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years","title":{"rendered":"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, Chitungwiza road and High Glen Road at Mbudzi roundabout with effect from the 18th of this month. The ministry is spearheading the construction of an interchange. In a statement seen by Pindula News, the ministry said the roads shall be closed for a period of one and half years and the motoring public shall be using the diversion routes, Malvin Road, Forbes Road, HopelyRoad, and Stoneridge Road. Reads the statement:<\/p>\n<p><b>Following the gazetting of General Notice Minister of Transport and Infrastructural De Act [Chapter13:181, shall close the portions \u2013 the layout plan 1-ZW125-C167 for the purposes of construction of Mbudzi interchange with effect from 18 September 2022. The portions of the roads hereunder shall be closed for a period of one and half years and the motoring public shall be using diversion route, Malvin Road, Forbes Road. HopelyRoad, and Stoneridge Road.<\/b><br \/>\n<b>Roads constituting the four legs of roads into Mbudzi traffic circle for a distance 1.5 kilometres long from the centre line of the traffic circle on all four legs. A portion of Harare \u2013 Masvingo Road at Mbudzi 1.5 kilometres before the centre line of the traffic circle and 1.5 kilometres after the traffic circle. A portion of Chitungwiza road 1.5 kilometres after the traffic circle going to Chitungwiza. A portion of High Glen Road 1.5 kilometres after the traffic circle going to High Glen.<\/b><br \/>\n<b>The closure of portions of these roads is with effect from 18 September 2022 for a period of one and half years. Motorists are urged to be patient during the construction period.<\/b><\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/zimbabwe\">Zimbabwe<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, Chitungwiza road and High Glen Road at Mbudzi roundabout with effect from the 18th of this month. The ministry is spearheading the construction of an interchange. In a statement seen by Pindula News, the ministry said [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":66088,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,4,35,15],"tags":[1493,2189,11810,11224,7656,7382,4798,19],"class_list":{"0":"post-66089","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-all-news","8":"category-community","9":"category-homepage-english","10":"category-twitter","11":"tag-africa-press","12":"tag-africa-press-zimbabwe-2","13":"tag-chitungwiza-road","14":"tag-harare-masvingo-road","15":"tag-high-glen-road","16":"tag-mbudzi-interchange","17":"tag-mbudzi-roundabout","18":"tag-zimbabwe"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v24.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years - zimbabwe<\/title>\n<meta name=\"description\" content=\"The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years\" \/>\n<meta property=\"og:description\" content=\"The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-13T15:40:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-09-13T18:28:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1007\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years\",\"name\":\"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg\",\"datePublished\":\"2022-09-13T15:40:49+00:00\",\"dateModified\":\"2022-09-13T18:28:44+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\"},\"description\":\"The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg\",\"width\":1007,\"height\":500,\"caption\":\"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.cc\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years - zimbabwe","description":"The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years","og_locale":"en_US","og_type":"article","og_title":"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years","og_description":"The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years","og_site_name":"zimbabwe","article_published_time":"2022-09-13T15:40:49+00:00","article_modified_time":"2022-09-13T18:28:44+00:00","og_image":[{"width":1007,"height":500,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years","name":"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg","datePublished":"2022-09-13T15:40:49+00:00","dateModified":"2022-09-13T18:28:44+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4"},"description":"The Ministry of Transport and Infrastructure Development has announced plans to close portions of Harare-Masvingo road, ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/09\/postQueueImg_31-6320cb7120242.jpg","width":1007,"height":500,"caption":"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/portions-of-roads-at-mbudzi-roundabout-closed-for-one-and-half-years#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.cc\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"Portions Of Roads At Mbudzi Roundabout Closed For One And Half Years"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/66089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/comments?post=66089"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/66089\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media\/66088"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media?parent=66089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/categories?post=66089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/tags?post=66089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}