{"id":67498,"date":"2022-10-11T16:17:29","date_gmt":"2022-10-11T14:17:29","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid"},"modified":"2022-10-11T19:37:30","modified_gmt":"2022-10-11T17:37:30","slug":"zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid","status":"publish","type":"post","link":"https:\/\/www.africa-press.cc\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid","title":{"rendered":"ZETDC Says 350k Still Waiting To Be Connected To The National Grid"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>The <b>Zimbabwe Electricity Transmission and Distribution Company (ZETDC)<\/b> has said more than 350 000 households who have applied for electricity connection are still waiting to be connected to the grid,<\/p>\n<p>ZETDC commercial director Mr Ralph Katsande there were numerous challenges to connecting new clients, mainly involving the required infrastructure. He told The Herald in a recent interview in Victoria Falls:<\/p>\n<p>As a country, we are facing a backlog of over 350 000 that require connection. We have got a customer base of over 850 000 and potentially we can connect another 360 000, but we don\u2019t have backbone infrastructure to do that.<\/p>\n<p>He said in the last couple of months, ZETDC had been on a recapitalisation drive to mobilise funds for projects including acquiring replacement equipment.<\/p>\n<p>ZETDC is also fighting thieves stealing cables and transformers, despite the minimum 10-year-sentences for this.<\/p>\n<p>Energy production and availability are part of the priority areas for the Government in its development agenda as the power supply is key to economic stabilisation and growth.<\/p>\n<p>Katsande said ZESA and ZETDC had come up with interventions to enable the utility to play its role in economic growth.<\/p>\n<p>Some of the interventions include increasing power generation to augment supply and signing up agreements with independent power producers to eliminate load shedding and eventually make the country a net exporter.<\/p>\n<p>ZETDC also has slightly over 23 000 customers who are off supply for long periods because of vandalism, which is costing the utility US$4 million per year in equipment damage and US$1.6 million per month in revenue.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/zimbabwe\">Zimbabwe<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who have applied for electricity connection are still waiting to be connected to the grid, ZETDC commercial director Mr Ralph Katsande there were numerous challenges to connecting new clients, mainly involving the required infrastructure. He told The [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":67497,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,6],"tags":[1493,2189,19,5528],"class_list":{"0":"post-67498","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-all-news","8":"category-economy","9":"tag-africa-press","10":"tag-africa-press-zimbabwe-2","11":"tag-zimbabwe","12":"tag-zimbabwe-electricity-transmission-and-distribution-company-zetdc"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v24.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>ZETDC Says 350k Still Waiting To Be Connected To The National Grid - zimbabwe<\/title>\n<meta name=\"description\" content=\"The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ZETDC Says 350k Still Waiting To Be Connected To The National Grid\" \/>\n<meta property=\"og:description\" content=\"The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-11T14:17:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-11T17:37:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"402\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid\",\"name\":\"ZETDC Says 350k Still Waiting To Be Connected To The National Grid - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg\",\"datePublished\":\"2022-10-11T14:17:29+00:00\",\"dateModified\":\"2022-10-11T17:37:30+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\"},\"description\":\"The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg\",\"width\":720,\"height\":402,\"caption\":\"ZETDC Says 350k Still Waiting To Be Connected To The National Grid\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.cc\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ZETDC Says 350k Still Waiting To Be Connected To The National Grid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ZETDC Says 350k Still Waiting To Be Connected To The National Grid - zimbabwe","description":"The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid","og_locale":"en_US","og_type":"article","og_title":"ZETDC Says 350k Still Waiting To Be Connected To The National Grid","og_description":"The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid","og_site_name":"zimbabwe","article_published_time":"2022-10-11T14:17:29+00:00","article_modified_time":"2022-10-11T17:37:30+00:00","og_image":[{"width":720,"height":402,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid","name":"ZETDC Says 350k Still Waiting To Be Connected To The National Grid - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg","datePublished":"2022-10-11T14:17:29+00:00","dateModified":"2022-10-11T17:37:30+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4"},"description":"The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has said more than 350 000 households who ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2022\/10\/postQueueImg_5-6345a9af29993.jpg","width":720,"height":402,"caption":"ZETDC Says 350k Still Waiting To Be Connected To The National Grid"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zetdc-says-350k-still-waiting-to-be-connected-to-the-national-grid#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.cc\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"ZETDC Says 350k Still Waiting To Be Connected To The National Grid"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/67498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/comments?post=67498"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/67498\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media\/67497"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media?parent=67498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/categories?post=67498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/tags?post=67498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}