{"id":73992,"date":"2023-02-13T08:45:11","date_gmt":"2023-02-13T06:45:11","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw"},"modified":"2023-02-13T11:17:19","modified_gmt":"2023-02-13T09:17:19","slug":"kariba-hydroelectric-power-stations-increase-power-generation-to-700mw","status":"publish","type":"post","link":"https:\/\/www.africa-press.cc\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw","title":{"rendered":"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW each.<\/p>\n<p>Zimbabwe\u2019s ZESA Holdings operates the Kariba South hydroelectric power station, while Zambia\u2019s ZESCO operates the Kariba North hydroelectric power station.<\/p>\n<p>ZRA chief executive Munyaradzi Munodawafa told <b>The Herald<\/b> that if power utilities do not exceed their generation limits, there would be room for increased power production. Said Munodawafa:<\/p>\n<p>The power utilities (ZESA and Zambia\u2019s ZESCO) should generate 700MW between them. I know in Zimbabwe there is winter wheat production.<\/p>\n<p>If the levels of production are maintained up to the end of March, then there shouldn\u2019t be any problems with the allocation for the winter wheat crop production.<\/p>\n<p>He said Kariba Dam was expected to have received between 40 and 44 billion cubic metres by the end of the season in June.<\/p>\n<p>This will allow ZESA and ZESCO to operate at their base production level of 1 200MW.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/zimbabwe\">Zimbabwe<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW each. Zimbabwe\u2019s ZESA Holdings operates the Kariba South hydroelectric power station, while Zambia\u2019s ZESCO operates the Kariba North hydroelectric power station. ZRA chief executive Munyaradzi Munodawafa told The Herald that if power utilities [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":73991,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,12],"tags":[1493,2189,2935,5319,3426,3425,675,1153,19,1233],"class_list":{"0":"post-73992","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-all-news","8":"category-policy","9":"tag-africa-press","10":"tag-africa-press-zimbabwe-2","11":"tag-kariba-dam","12":"tag-kariba-power-station","13":"tag-lake-kariba","14":"tag-zambezi-river-authority","15":"tag-zesa","16":"tag-zesco","17":"tag-zimbabwe","18":"tag-zra"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v24.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Kariba Hydroelectric Power Stations Increase Power Generation To 700MW - zimbabwe<\/title>\n<meta name=\"description\" content=\"The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW ea ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW\" \/>\n<meta property=\"og:description\" content=\"The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW ea ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-13T06:45:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-13T09:17:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw\",\"name\":\"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg\",\"datePublished\":\"2023-02-13T06:45:11+00:00\",\"dateModified\":\"2023-02-13T09:17:19+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\"},\"description\":\"The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW ea ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg\",\"width\":1024,\"height\":536,\"caption\":\"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.cc\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW - zimbabwe","description":"The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW ea ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw","og_locale":"en_US","og_type":"article","og_title":"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW","og_description":"The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW ea ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw","og_site_name":"zimbabwe","article_published_time":"2023-02-13T06:45:11+00:00","article_modified_time":"2023-02-13T09:17:19+00:00","og_image":[{"width":1024,"height":536,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw","name":"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg","datePublished":"2023-02-13T06:45:11+00:00","dateModified":"2023-02-13T09:17:19+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4"},"description":"The Zambezi River Authority (ZRA) has increased the generation limit on the Kariba power stations from 300MW to 350MW ea ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/02\/postQueueImg_1676265319.97.jpg","width":1024,"height":536,"caption":"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-hydroelectric-power-stations-increase-power-generation-to-700mw#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.cc\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"Kariba Hydroelectric Power Stations Increase Power Generation To 700MW"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/73992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/comments?post=73992"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/73992\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media\/73991"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media?parent=73992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/categories?post=73992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/tags?post=73992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}