{"id":74752,"date":"2023-03-02T20:00:11","date_gmt":"2023-03-02T18:00:11","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda"},"modified":"2023-03-02T22:21:07","modified_gmt":"2023-03-02T20:21:07","slug":"hwange-unit-7-to-come-on-grid-on-16-march-minister-soda","status":"publish","type":"post","link":"https:\/\/www.africa-press.cc\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda","title":{"rendered":"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to come on line April.<\/p>\n<p>This was said by the Minister of Energy and Power Development Minister, Soda Zhemu on Wednesday during the National Assembly question and answer session, reported The Herald.<\/p>\n<p>He was responding to a question by Chegutu West MP, Dexter Nduna (ZANU PF) on what Government was doing to address power blackouts that worsened this week. Said Soda:<\/p>\n<p>According to ZESA, Unit 7 shall be tied on the grid on the 16th of this month while Unit 8 will come on board a month later.<\/p>\n<p>Soda blamed the ageing equipment at Hwange Power Station the for the electricity crisis. He said:<\/p>\n<p>This week we noticed there was a depressed power supply which was occasioned by unfortunate outages at Hwange and we lost three units from the 23rd of February.<\/p>\n<p>This is a result of the age of the equipment which we have always spoken about.<\/p>\n<p>The equipment is now very old, the power station was constructed a long time ago and the equipment is now due for replacement at Hwange power station.<\/p>\n<p>It is unfortunate because these outages are not planned. If they were planned outages, then warnings would have been sent by the power utility.<\/p>\n<p>Soda also said the water level at Kariba Dam was rising and was now at 14 percent of live storage. He said:<\/p>\n<p>We hope this will inform the allocation of water for power generation when it\u2019s due for review in a fortnight.<\/p>\n<p>National Assembly Speaker Jacob Mudenda said there was a need for Soda to bring a comprehensive ministerial statement on the power crisis.<\/p>\n<p>On Wednesday, 01 March 2023, the Zimbabwe Power Company (ZPC) was generating a total of 352MW.<\/p>\n<p>Kariba was producing 280MW while Hwange was generating a paltry 72MW.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/zimbabwe\">Zimbabwe<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to come on line April. This was said by the Minister of Energy and Power Development Minister, Soda Zhemu on Wednesday during the National Assembly question and answer [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":74751,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,6],"tags":[1493,2189,5208,5377,12814,2518,1541,14123,2517,19],"class_list":{"0":"post-74752","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-all-news","8":"category-economy","9":"tag-africa-press","10":"tag-africa-press-zimbabwe-2","11":"tag-hwange-power-station","12":"tag-hwange-thermal-power-station","13":"tag-hwange-unit-7-and-8","14":"tag-load-shedding","15":"tag-power-cuts","16":"tag-unit-7","17":"tag-zhemu-soda","18":"tag-zimbabwe"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.1 (Yoast SEO v24.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda - zimbabwe<\/title>\n<meta name=\"description\" content=\"The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to c ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda\" \/>\n<meta property=\"og:description\" content=\"The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to c ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-02T18:00:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-02T20:21:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"402\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda\",\"name\":\"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg\",\"datePublished\":\"2023-03-02T18:00:11+00:00\",\"dateModified\":\"2023-03-02T20:21:07+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\"},\"description\":\"The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to c ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg\",\"width\":720,\"height\":402,\"caption\":\"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.cc\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda - zimbabwe","description":"The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to c ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda","og_locale":"en_US","og_type":"article","og_title":"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda","og_description":"The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to c ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda","og_site_name":"zimbabwe","article_published_time":"2023-03-02T18:00:11+00:00","article_modified_time":"2023-03-02T20:21:07+00:00","og_image":[{"width":720,"height":402,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda","name":"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg","datePublished":"2023-03-02T18:00:11+00:00","dateModified":"2023-03-02T20:21:07+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4"},"description":"The new Unit 7 at Hwange Thermal Power Station is expected to come on the grid on 16 March while Unit 8 is expected to c ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2023\/03\/postQueueImg_1677774657.18.jpg","width":720,"height":402,"caption":"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/hwange-unit-7-to-come-on-grid-on-16-march-minister-soda#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.cc\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"Hwange Unit 7 To Come On Grid On 16 March \u2013 Minister Soda"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/2e02b5816e71b1149d79877f669a85e4","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/74752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/comments?post=74752"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/posts\/74752\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media\/74751"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/media?parent=74752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/categories?post=74752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.cc\/zimbabwe\/wp-json\/wp\/v2\/tags?post=74752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}